| How long will it
take to build my Home? |
| If
there are no special permit
issues usually 3-4 months from
the time the building permit is
received. |
| |
| Can I have any
house built on my property or
one of your building sites? |
| The
zoning and size of the lot
dictates the size of the home to
be built, you may choose any
style of home you would like but
the size and location of the
home on the property must be
acceptable and approved by the
town of Southampton. |
| |
| Can a standard
set of house plans be customized
to a design I like? |
| This is
actually the most reasonable way
to build a custom home. To take
one of our architects plans and
modify them to your own likes
and needs. |
| |
| If I have
property already can Whalen
Homes build on my site? |
| Whalen
homes can act as a General
Contractor and assist in
acquiring the necessary permits
needed to build on your job
site. |
| |
| Does my new
Whalen Home come with a
guarantee? |
| Whalen
Homes offers an extensive
guarantee on all our new homes.
It is available to all our clients
to review. |
| |
| What might delay
the construction of my home? |
| Weather
is one thing that may delay
construction. We do work or try
to in all conditions that are
safe and will allow a specific
aspect of construction to be
performed. Inspection scheduling
is something that we cannot
control and at times might
contribute a slight delay. |
| |